Condo kitchen replacement · Aventura
Aventura tower, developer cabinetry replaced
Original 2004 developer cabinetry in a high-rise with a four-day work week and one service elevator. Replaced with matte handleless frameless, appliance panels integrated.
What happened
Board packet assembled and submitted before contract, approved in under three weeks.
Concrete walls out of plumb by more than an inch across the run — every panel scribed.
Integrated panels on the refrigerator and dishwasher so the run reads as one continuous wall.